Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Table of Contents


Method

Info

To be able to generate a control plan, the document type of the structure has to be PROCESS.

...


Select an existing control plan or create a new control plan by entering a name (this defaults to the name of the current process element). Then click on Finish. - Outcome: the control plan will open.

...

Filtering and adjusting the Display of the Control Plan Editor

You can change the appearance of the control plan. From the right upper corner, you have to following
options:

...

Note that there are options in the preferences menu regarding the Control Plan editor: showing and
hiding responsibilities and comments and adjusting the layout to fit the window width.

...

SOX P-FMEA - Deriving a Control Plan From a P-FMEA

Introduction

To create a P-FMEA, follow the new FMEA Step-by-Step Guide.

To derive a control plan from P-FMEA, prepare the P-FMEA as follows:

...

Info

Product and process characteristics as well as tasks assigned to control method and reaction plan will appear in corresponding columns of the control plan.

Example P-FMEA Structure

...

To create tasks on containers Control method and Reaction plan, right click on either and select New > New Task (same as for prevention and detection actions on action groups).

...

Choose Select existing or “New” to create a new control plan. - Outcome: product and Process characteristics as well as tasks assigned to control method and reaction plan appear in the corresponding columns.

...

Adding Content to a Control Plan

To specify the Tolerance of a characteristic, a requirement of suitable type needs to be assigned to it providing the attributes needed for specification. How to customize requirement types is described in section SOX RM.

...

To specify sample size and frequency, double-click in the relevant column and edit the values.

...

Anchor
soxrm
soxrm
SOX RM - Creating a Requirement Type for a Control Plan

To specify the tolerance of a characteristic in a control plan a new requirement type needs to be defined to customize the attributes of the characteristic as needed. In this example, the requirement type “Variable Characteristic” is defined.

...