Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Requirements can be linked with other SOX elements. For example, a requirement can be assigned
to a system element.

Prerequisite: A requirement and a system element have been created. The RM Editor and the PSS
view are active.

  1. Select the desired requirement.

  2. Drag and drop it from the RM Editor onto the desired element in the PSS view.

Outcome: The linked element will be marked with a “requirement” symbol (capital 'R') and the requirement will be added to the element in the PSS view.

The safety level will propagate if a safety goal is associated with the element that was linked to a requirement.

The following elements can be linked to requirements:

  • BOM modules

  • System elements

  • Functions/malfunctions

  • Safety goals.


Also see:

  • No labels